Outline: The course will provide understanding of different reserve estimation methods in order to evaluate projects, creating business plans,and reporting the volumes as a standard practice in order to give a practical picture of company’s performance to the stakeholders. Planning and execution of project requires estimates of discovered and recoverable volumes Production: Managing producing operations to achieve effective/efficient recovery requires constant monitoring/re-evaluation of remaining volume potential.
The objective of the course is to enhance awareness of the importance and determination of reserves for an oil and gas operator.
Course Duration: 5 days.
Prerequisite: Familiarity with Petroleum / Reservoir Engineering concepts are desirable but not an absolute necessity. Students and Professionals are welcomed to join the course and learn about the upstream production engineering domain.Program Outlines:
- Introduction to Reserves Estimation
- Different methods and application of reserves estimation
(Exercises on Excel sheets)
- Volumetric
- Decline curve analysis
- Material balance calculations